Early warning
Upcoming at council
Open lobbying registrations that are not yet linked to any council or committee agenda item, with an estimated window for when a linked item may appear, based on how long past registrations on the same topic took.
- With an estimated window
- 1,589
- 99% of open registrations
- Lead-time sample
- 1,207
- Registrations with a published link
1,609 open registrations without a linked item; 1,589 have an estimated window. Lead times are drawn from 1,207 registrations with a published link.
Open registrations by topic
Top 10Topic spikes in the last 12 months
New registrations vs previous 12-month averageData table· 26 rows
Open registrations: Site plan approval
All topics →- 3 December 2026 – 20 January 2030Choice PropertiesSM31597 · approved 23 April 2021
- 15 December 2026 – 1 February 2030First GulfSM31645 · approved 5 May 2021
- 17 December 2026 – 3 February 2030Tribute CommunitiesSM31653 · approved 7 May 2021
- 31 January 2027 – 20 March 2030Sequoia Stockyards LPSM31887 · approved 21 June 2021
- 9 February 2027 – 9 October 2029Easton's Group of HotelsSM35401 · approved 2 April 2024
- 9 February 2027 – 9 October 2029Choice PropertiesSM35460 · approved 2 April 2024
- 10 February 2027 – 10 October 2029297506 Ontario LimitedSM35445 · approved 3 April 2024
- 22 February 2027 – 11 April 2030Goldman Group, TheSM32037 · approved 13 July 2021
- 25 February 2027 – 24 November 2029Minto (Dawes) LPSM35624 · approved 23 May 2024
- 4 March 2027 – 1 December 2029CentreCourtSM35582 · approved 30 May 2024
- 4 March 2027 – 1 December 2029CentreCourtSM35585 · approved 30 May 2024
- 10 March 2027 – 26 December 2029Pinnacle InternationalSM34316 · approved 14 March 2023
12 of 200 shown as cards; all are in the data table.
Data table· 200 rows
| Registration | Client | Topic | Approved | Estimated window for a linked item |
|---|---|---|---|---|
| SM31597 Development of 123 Parkway Forest Drive, North York ON M2J 0G1 | Choice Properties | Site plan approval | 23 April 2021 | 3 December 2026 to 20 January 2030 from this topic's lead times (n=10) |
| SM31645 3650 Danforth Ave- Planning and Development applications and items for an Industrial Building. | First Gulf | Site plan approval | 5 May 2021 | 15 December 2026 to 1 February 2030 from this topic's lead times (n=10) |
| SM31653 Proposed mixed use development at 148-158 Avenue Road and 220-234 Davenport Road | Tribute Communities | Site plan approval | 7 May 2021 | 17 December 2026 to 3 February 2030 from this topic's lead times (n=10) |
| SM31887 1799 St. Clair Avenue West | Sequoia Stockyards LP | Site plan approval | 21 June 2021 | 31 January 2027 to 20 March 2030 from this topic's lead times (n=10) |
| SM35401 906 Yonge Street and 25 McMurrich Street | Easton's Group of Hotels | Site plan approval | 2 April 2024 | 9 February 2027 to 9 October 2029 from this topic's lead times (n=31) |
| SM35460 Development application for 26 GRENVILLE & 27 GROSVENOR | Choice Properties | Site plan approval | 2 April 2024 | 9 February 2027 to 9 October 2029 from this topic's lead times (n=31) |
| SM35445 2346 Yonge St Development Application | 297506 Ontario Limited | Site plan approval | 3 April 2024 | 10 February 2027 to 10 October 2029 from this topic's lead times (n=31) |
| SM32037 1001 Ellesmere Road | Goldman Group, The | Site plan approval | 13 July 2021 | 22 February 2027 to 11 April 2030 from this topic's lead times (n=10) |
| SM35624 9 and 25 Dawes Road | Minto (Dawes) LP | Site plan approval | 23 May 2024 | 25 February 2027 to 24 November 2029 from this topic's lead times (n=33) |
| SM35582 5-9 Jopling Ave S | CentreCourt | Site plan approval | 30 May 2024 | 4 March 2027 to 1 December 2029 from this topic's lead times (n=33) |
| SM35585 2200 Eglinton Ave E | CentreCourt | Site plan approval | 30 May 2024 | 4 March 2027 to 1 December 2029 from this topic's lead times (n=33) |
| SM34316 The design of Phases 4 and 5 of 1 Yonge St, Toronto, ON M5E 1E5. | Pinnacle International | Site plan approval | 14 March 2023 | 10 March 2027 to 26 December 2029 from this topic's lead times (n=19) |
| SM32166 Residential & Mixed-use project 2300 Yonge Street, Suite 500, Toronto ON | RC 3180 DUFFERING LP | Site plan approval | 6 August 2021 | 18 March 2027 to 5 May 2030 from this topic's lead times (n=10) |
| SM32215 Residential and mixed-use project located at 3180 Dufferin St | RioCan Management Inc. | Site plan approval | 16 August 2021 | 28 March 2027 to 15 May 2030 from this topic's lead times (n=10) |
| SM32216 Proposed residential building at 1100 Sheppard Avenue West | Sheppard Residences Limited Partnership | Site plan approval | 16 August 2021 | 28 March 2027 to 15 May 2030 from this topic's lead times (n=10) |
| SM35728 3526 Lakeshore Blvd. West. | Minto Communities Inc. | Site plan approval | 4 July 2024 | 4 April 2027 to 4 January 2030 from this topic's lead times (n=35) |
| SM32375 Molson Coors is making a large capital investment at its Toronto Brewer that requires demolition and building permits. | Molson Coors Canada 2005 | Site plan approval | 28 September 2021 | 6 April 2027 to 5 November 2029 from this topic's lead times (n=11) |
| SM34393 8 – 16 Locust Street | 8-16 Locust Street LP | Site plan approval | 11 April 2023 | 7 April 2027 to 23 January 2030 from this topic's lead times (n=19) |
| SM32378 Development of 1880 Eglinton Avenue East | Choice Properties | Site plan approval | 29 September 2021 | 7 April 2027 to 6 November 2029 from this topic's lead times (n=11) |
| SM32246 Delay with issuance of Notice of Approval Conditions - 2787 Eglinton Avenue East | Mattamy (Danforth) Limited | Site plan approval | 26 August 2021 | 7 April 2027 to 25 May 2030 from this topic's lead times (n=10) |
| SM23667 19 Glen Agar Drive, Etobicoke | Minto Communities Inc. | Site plan approval | 1 November 2016 | 7 April 2027 to 27 August 2030 from all topics' lead times (n=37) |
| SM37397 34-50 Southport Street | Southport Street Development Corporation | Site plan approval | 13 February 2026 | 10 April 2027 to 21 December 2029 from this topic's lead times (n=60) |
| SM37398 1798-1812 Weston Road | CastlepointNuma | Site plan approval | 13 February 2026 | 10 April 2027 to 21 December 2029 from this topic's lead times (n=60) |
| SM35737 3204 Eglinton Ave East | RioCan | Site plan approval | 10 July 2024 | 10 April 2027 to 10 January 2030 from this topic's lead times (n=35) |
| SM35746 2187 Bloor St West | CP REIT Ontario Properties Limited | Site plan approval | 11 July 2024 | 11 April 2027 to 11 January 2030 from this topic's lead times (n=35) |
| SM37414 Exploring partnership options with the City to develop the property at 7 Jackes Avenue. | Starlight Investments | Site plan approval | 18 February 2026 | 15 April 2027 to 26 December 2029 from this topic's lead times (n=60) |
| SM37451 Planning applications related to 1020 McNicoll Avenue | Extendicare | Site plan approval | 3 March 2026 | 16 April 2027 to 25 December 2029 from this topic's lead times (n=63) |
| SM32412 Retain existing permission for “Club” use in employment zoning by-law, particularly as it applies to 1123 Leslie Street, and site plan approval. | OTT Properties Inc. | Site plan approval | 12 October 2021 | 20 April 2027 to 19 November 2029 from this topic's lead times (n=11) |
| SM35216 789-793 Don Mills Road | 789 Don Mills Developments Inc. | Site plan approval | 17 January 2024 | 25 April 2027 to 28 August 2029 from this topic's lead times (n=28) |
| SM35217 10 Ferrand Drive | 789 Don Mills Developments Inc. | Site plan approval | 17 January 2024 | 25 April 2027 to 28 August 2029 from this topic's lead times (n=28) |
| SM32346 2116 Eglinton Avenue West | Oldstonehenge Development Corporation | Site plan approval | 16 September 2021 | 28 April 2027 to 15 June 2030 from this topic's lead times (n=10) |
| SM35234 To support development applications and related neighbourhood infrastructure at and near 309 Cherry St. | Castlepoint Numa | Site plan approval | 2 February 2024 | 30 April 2027 to 15 August 2029 from this topic's lead times (n=29) |
| SM35283 We are interested in bringing topics related to a site at 5175 Yonge St and 5165 Yonge St. | Terracap Management Inc. | Site plan approval | 2 February 2024 | 30 April 2027 to 15 August 2029 from this topic's lead times (n=29) |
| SM35244 General Engagement - Application being made for 1071 King Street West. | Hullmark Asset Management | Site plan approval | 23 January 2024 | 1 May 2027 to 3 September 2029 from this topic's lead times (n=28) |
| SM23545 1124, 1128 and 1130 Islington Avenue | Plazacorp Investments Limited | Site plan approval | 22 September 2016 | 1 May 2027 to 17 August 2030 from all topics' lead times (n=35) |
| SM23556 110 Maitland Street and adjacent properties | Minto Communities Inc. | Site plan approval | 23 September 2016 | 2 May 2027 to 18 August 2030 from all topics' lead times (n=35) |
| SM32477 50 Wilson Heights | Deltera Inc. | Site plan approval | 25 October 2021 | 3 May 2027 to 2 December 2029 from this topic's lead times (n=11) |
| SM37589 Matters relating to the development of the lands municipally identified as 110 Sheppard Avenue East. | Streamliner Properties Inc. | Site plan approval | 23 April 2026 | 5 May 2027 to 14 February 2030 from this topic's lead times (n=65) |
| SM37590 Matters relating to the development of the land municipally identified as 271 Russell Hill Road | Newpoint Developments Inc. | Site plan approval | 23 April 2026 | 5 May 2027 to 14 February 2030 from this topic's lead times (n=65) |
| SM37591 Matters relating to the development of the land municipally identified as 271 Russell Hill Road | Newpoint Developments Inc. | Site plan approval | 23 April 2026 | 5 May 2027 to 14 February 2030 from this topic's lead times (n=65) |
| SM34628 Development Applications at 665-671 Sheppard Ave West. | Reego Xue (Mingxing Xue) | Site plan approval | 12 July 2023 | 5 May 2027 to 17 April 2030 from this topic's lead times (n=21) |
| SM37522 1-7 Yonge Street (south Block) | Pinnacle International | Site plan approval | 31 March 2026 | 6 May 2027 to 22 January 2030 from this topic's lead times (n=64) |
| SM35301 494 Gilbert Avenue | SmartCentres REIT | Site plan approval | 8 February 2024 | 6 May 2027 to 21 August 2029 from this topic's lead times (n=29) |
| SM35302 2545 - 2549 Weston Road, Toronto, Ontario, M9N 2A7 | CP REIT Ontario Properties Limited | Site plan approval | 8 February 2024 | 6 May 2027 to 21 August 2029 from this topic's lead times (n=29) |
| SM23835 462 Eastern Avenue Proposed Mixed Use Development | Graywood Developments Ltd. | Site plan approval | 20 December 2016 | 10 May 2027 to 19 September 2030 from all topics' lead times (n=38) |
| SM23836 1771 St Clair Avenue West Proposed residential development with retail at grade | Graywood Developments Ltd. | Site plan approval | 20 December 2016 | 10 May 2027 to 19 September 2030 from all topics' lead times (n=38) |
| SM23837 1779 St Clair Avenue West Proposed residential development with retail at grade | Graywood Developments Ltd. | Site plan approval | 20 December 2016 | 10 May 2027 to 19 September 2030 from all topics' lead times (n=38) |
| SM23838 250 Lawrence Avenue West Proposed residential development | Graywood Developments Ltd. | Site plan approval | 20 December 2016 | 10 May 2027 to 19 September 2030 from all topics' lead times (n=38) |
| SM34545 Development and planning application matters related to 1 & 2-14 Sumach Street, as well as City property abutting the site. | Block (Sumach) Developments Limited | Site plan approval | 6 June 2023 | 11 May 2027 to 16 March 2030 from this topic's lead times (n=20) |
| SM35314 To discuss active development application for 25 Fisherville Road. | Starlight Investments | Site plan approval | 14 February 2024 | 12 May 2027 to 27 August 2029 from this topic's lead times (n=29) |
| SM32526 Planning and Development, Combined Application -1141 Bloor Street West, Toronto | Fitzrovia Residential Inc. | Site plan approval | 3 November 2021 | 12 May 2027 to 11 December 2029 from this topic's lead times (n=11) |
| SM37616 Development approvals on a site in a Core Employment Area (65 Heward Ave) | Heward Studio Investments Inc. | Site plan approval | 5 May 2026 | 13 May 2027 to 16 January 2030 from this topic's lead times (n=67) |
| SM34541 The finalization of the approvals necessary for the construction of an approved 16 storey residential mixed-use development. 53 Sheppard Avenue West | Sheppard Bogert Developments Limited | Site plan approval | 8 June 2023 | 13 May 2027 to 18 March 2030 from this topic's lead times (n=20) |
| SM37592 Matters relating to the development of the lands municipally identified as 110 Sheppard Avenue East. | Streamliner Properties Inc. | Site plan approval | 6 May 2026 | 14 May 2027 to 17 January 2030 from this topic's lead times (n=67) |
| SM37544 316-336 Campbell Avenue Planning and Permit Approvals | Marlin Spring Developments | Site plan approval | 8 April 2026 | 14 May 2027 to 30 January 2030 from this topic's lead times (n=64) |
| SM37547 1913-1951 Yonge Street, 10-11 Davisville Avenue, 17-21 Millwood Road | Times Group Corporation | Site plan approval | 9 April 2026 | 15 May 2027 to 31 January 2030 from this topic's lead times (n=64) |
| SM37623 Development approvals on a site in a Core Employment Area (65 Heward Ave) | Heward Studio Investments Inc. | Site plan approval | 8 May 2026 | 16 May 2027 to 19 January 2030 from this topic's lead times (n=67) |
| SM34557 Providing an update on the status of the development application for 1303 Yonge Street. | Aspen Ridge Homes | Site plan approval | 13 June 2023 | 18 May 2027 to 23 March 2030 from this topic's lead times (n=20) |
| SM37229 Related to development applications for a mixed use development at 4800 Yonge Street. | Menkes Developments Ltd | Site plan approval | 11 December 2025 | 20 May 2027 to 7 December 2029 from this topic's lead times (n=55) |
| SM34668 1100, 1120-1130 & 1150 Caledonia Rd | OPGI Management GP Inc. | Site plan approval | 27 July 2023 | 20 May 2027 to 8 February 2030 from this topic's lead times (n=22) |
| SM37627 Seeking guidance, comments and feedback for a development application at 515-519 Jarvis St. | Jarvis Mansions (Toronto) Limited | Site plan approval | 13 May 2026 | 21 May 2027 to 24 January 2030 from this topic's lead times (n=67) |
| SM37628 Potential planning applications for 515-519 Jarvis Street | Farhi Holdings Corporation | Site plan approval | 13 May 2026 | 21 May 2027 to 24 January 2030 from this topic's lead times (n=67) |
| SM37631 Development approvals and ongoing development support at 8-18 Locust Street, Toronto | Fengate Capital Management Limited | Site plan approval | 14 May 2026 | 22 May 2027 to 25 January 2030 from this topic's lead times (n=67) |
| SM23611 Via Bloor, 575-585 Bloor Street East | Deltera Inc. | Site plan approval | 13 October 2016 | 22 May 2027 to 7 September 2030 from all topics' lead times (n=35) |
| SM37683 Easement agreements with regards to the planning and development application for 110 Maitland Street. | Minto (110 Maitland) GP Inc. | Site plan approval | 27 May 2026 | 24 May 2027 to 18 January 2030 from this topic's lead times (n=68) |
| SM23851 5415, 5421-5429, 5453, 5475, 5481, 5485 and 5487 Dundas Street West and 15 and 25 Shorncliffe Road | Mondiale Development LTD. | Site plan approval | 3 January 2017 | 24 May 2027 to 3 October 2030 from all topics' lead times (n=38) |
| SM37664 Education of green earth retaining systems for the City. ECO Friendly Green Infrastructure | Trexiana Flex MSE | Site plan approval | 20 May 2026 | 28 May 2027 to 31 January 2030 from this topic's lead times (n=67) |
| SM21712 350-354 Adelaide St. W. and 102-118 Peter St. Proposed Mixed-Use Development. | Graywood Developments Ltd. | Site plan approval | 24 April 2015 | 29 May 2027 to 11 March 2030 from all topics' lead times (n=21) |
| SM35370 Council-approved SASP 793 as it applies to 4630-4570 Sheppard Avenue East. | Canadian Tire REIT | Site plan approval | 4 March 2024 | 31 May 2027 to 15 September 2029 from this topic's lead times (n=29) |
| SM34591 To set up meeting with councillor regarding site. Site plan application City of Toronto 23 140846 NNY 08 SA, regarding site located at 0, 1100, 1120-1130 & 1150 Caledonia Rd. | Oxford Properties Group | Site plan approval | 26 June 2023 | 31 May 2027 to 5 April 2030 from this topic's lead times (n=20) |
| SM37288 3201 Eglinton Avenue East - Site Plan Application | RioCan Real Estate Investment Trust | Site plan approval | 6 January 2026 | 1 June 2027 to 29 December 2029 from this topic's lead times (n=56) |
| SM21855 34 Southport Street, Toronto. | State Building Group | Site plan approval | 25 May 2015 | 1 June 2027 to 22 December 2029 from all topics' lead times (n=23) |
| SM37289 44 Romfield Drive | The Muzzo Group of Companies | Site plan approval | 7 January 2026 | 2 June 2027 to 30 December 2029 from this topic's lead times (n=56) |
| SM37290 3940 Keele Street | The Muzzo Group of Companies | Site plan approval | 7 January 2026 | 2 June 2027 to 30 December 2029 from this topic's lead times (n=56) |
| SM37292 1613 St. Clair Avenue West | MA Development Services Inc. | Site plan approval | 8 January 2026 | 3 June 2027 to 31 December 2029 from this topic's lead times (n=56) |
| SM37293 479R, 485 and 487 Duplex Avenue | MA Development Services Inc. | Site plan approval | 8 January 2026 | 3 June 2027 to 31 December 2029 from this topic's lead times (n=56) |
| SM37302 Development application at 125 The Queensway, adjacent to Ontario Food Terminal | The Toronto Wholesale Produce Association | Site plan approval | 8 January 2026 | 3 June 2027 to 31 December 2029 from this topic's lead times (n=56) |
| SM24023 Assisting Tribute Communities with applications for 70-72 Carlton Street | Tribute Communities | Site plan approval | 10 February 2017 | 3 June 2027 to 25 August 2030 from all topics' lead times (n=41) |
| SM24024 Assisting Tribute Communities with applications at 8817-8833 Sheppard Avenue East | Tribute Communities | Site plan approval | 10 February 2017 | 3 June 2027 to 25 August 2030 from all topics' lead times (n=41) |
| SM24025 Assisting Tribute Communities with applications for 75, 77-83 Mutual Street | Tribute Communities | Site plan approval | 10 February 2017 | 3 June 2027 to 25 August 2030 from all topics' lead times (n=41) |
| SM24026 Assisting Tribute Communities with the applications for 2135 Sheppard Avenue East | Tribute Communities | Site plan approval | 10 February 2017 | 3 June 2027 to 25 August 2030 from all topics' lead times (n=41) |
| SM35884 Site Plan Agreement for two under construction purpose-built rental apartment buildings at 88 Queen Street East | Fitzrovia Residential Inc. | Site plan approval | 3 September 2024 | 4 June 2027 to 6 March 2030 from this topic's lead times (n=35) |
| SM35385 4186-4190 Finch Avenue East mixed use site | Torgan Construction Limited | Site plan approval | 8 March 2024 | 4 June 2027 to 19 September 2029 from this topic's lead times (n=29) |
| SM37702 Matters relating to the development of the property municipally identified as 150, 158, 164, 181 and 200 Sterling Road and 20 Perth Avenue | HC Lower JCT Holdings LP | Site plan approval | 8 June 2026 | 5 June 2027 to 30 January 2030 from this topic's lead times (n=68) |
| SM37704 Matters relating to planning approvals for the proposed redevelopment of the lands identified as 64-86 Bathurst Street | HNC Bathurst Street Inc. | Site plan approval | 8 June 2026 | 5 June 2027 to 30 January 2030 from this topic's lead times (n=68) |
| SM37353 278 – 280 Viewmount Avenue | Altree Developments Inc. | Site plan approval | 26 January 2026 | 5 June 2027 to 31 December 2029 from this topic's lead times (n=58) |
| SM37355 2-12 Oakburn Crescent | KG Group | Site plan approval | 26 January 2026 | 5 June 2027 to 31 December 2029 from this topic's lead times (n=58) |
| SM36120 89, 97 and 99 Church Street | Minto (89 Church) LP | Site plan approval | 18 November 2024 | 5 June 2027 to 15 January 2030 from this topic's lead times (n=40) |
| SM36122 115 and 135 Tyndall Avenue | Fitzrovia | Site plan approval | 18 November 2024 | 5 June 2027 to 15 January 2030 from this topic's lead times (n=40) |
| SM37359 Engineering elements of the development application for an industrial redevelopment of 25 Bethridge Road | Prologis, Inc. | Site plan approval | 27 January 2026 | 6 June 2027 to 1 January 2030 from this topic's lead times (n=58) |
| SM37360 Engineering elements of the development application for an industrial redevelopment of 25 Bethridge Road | Prologis, Inc. | Site plan approval | 27 January 2026 | 6 June 2027 to 1 January 2030 from this topic's lead times (n=58) |
| SM24059 Discussing 30 Bay Toronto options | OPGI Management GP Inc. | Site plan approval | 28 February 2017 | 8 June 2027 to 12 September 2030 from all topics' lead times (n=42) |
| SM37767 905 Middlefield Rd | EM Dynamics | Site plan approval | 9 July 2026 | 9 June 2027 to 9 February 2030 from this topic's lead times (n=69) |
| SM36142 Matters relating to the development of the lot at 2293 Eglinton Avenue East, including floodplain mitigation. | BentallGreenOak (Canada) Limited Partnership | Site plan approval | 22 November 2024 | 9 June 2027 to 19 January 2030 from this topic's lead times (n=40) |
| SM36143 355 Adelaide St W | 355 Adelaide Nominee Inc | Site plan approval | 22 November 2024 | 9 June 2027 to 19 January 2030 from this topic's lead times (n=40) |
| SM35392 2346 Yonge Street Development Application | 297506 Ontario Limited | Site plan approval | 13 March 2024 | 9 June 2027 to 24 September 2029 from this topic's lead times (n=29) |
| SM37720 3101 Kennedy Rd | Huifeng Canada Inc. | Site plan approval | 15 June 2026 | 12 June 2027 to 6 February 2030 from this topic's lead times (n=68) |
| SM36147 16 Oxley Street and 46 Charlotte Street | 355 Adelaide Nominee Inc | Site plan approval | 25 November 2024 | 12 June 2027 to 22 January 2030 from this topic's lead times (n=40) |
| SM35913 980-990 Avenue Road Permit Support. | 990 Bloor Street West LP | Site plan approval | 11 September 2024 | 12 June 2027 to 14 March 2030 from this topic's lead times (n=35) |
| SM37772 1-3 Concorde Gate and 10-12 Concorde Place: mixed-use redevelopment of the Concorde Corporate Centre lands. | Fengate Asset Management | Site plan approval | 13 July 2026 | 13 June 2027 to 13 February 2030 from this topic's lead times (n=69) |
| SM37773 Lobbying for Planning and Development Application for the following project: 53 & 55 Widdicombe Hill Blvd | QuadReal Real Property Group Limited Partnership | Site plan approval | 14 July 2026 | 14 June 2027 to 14 February 2030 from this topic's lead times (n=69) |
| SM34737 120-134 Sherbourne Street and 225-229 Queen Street East. | Dash Urban Inc. | Site plan approval | 21 August 2023 | 14 June 2027 to 5 March 2030 from this topic's lead times (n=22) |
| SM34739 Development at 20-26 Maitland | Plazacorp Investments Limited | Site plan approval | 21 August 2023 | 14 June 2027 to 5 March 2030 from this topic's lead times (n=22) |
| SM37778 Approval and zoning of the proposed long-term care facility at 60 Guildwood Parkway. | Extendicare | Site plan approval | 16 July 2026 | 16 June 2027 to 16 February 2030 from this topic's lead times (n=69) |
| SM37779 Approval and zoning of the proposed long-term care facility at 60 Guildwood Parkway | Extendicare | Site plan approval | 16 July 2026 | 16 June 2027 to 16 February 2030 from this topic's lead times (n=69) |
| SM37781 Approval and zoning of the proposed long-term care facility at 60 Guildwood Parkway | Extendicare | Site plan approval | 16 July 2026 | 16 June 2027 to 16 February 2030 from this topic's lead times (n=69) |
| SM37782 Approval and zoning of the proposed long-term care facility at 60 Guildwood Parkway | Extendicare | Site plan approval | 16 July 2026 | 16 June 2027 to 16 February 2030 from this topic's lead times (n=69) |
| SM35427 Development and construction of Affordable Housing, TTC Tunnel Connection, Community Hub and Multi-Residential Apartment Buildings at 980 Dufferin Street | Fitzrovia Residential Inc. | Site plan approval | 20 March 2024 | 16 June 2027 to 1 October 2029 from this topic's lead times (n=29) |
| SM35957 Planning application associated with the redevelopment 1648-1664 Dupont Street, Toronto | Dupont Dev LP | Site plan approval | 20 September 2024 | 21 June 2027 to 23 March 2030 from this topic's lead times (n=35) |
| SM37812 271 Russell Hill Road | Newpoint Developments Inc. | Site plan approval | 23 July 2026 | 23 June 2027 to 23 February 2030 from this topic's lead times (n=69) |
| SM36181 A proposed development on the subject lands municipally known as 99 and 109 Cartwright Avenue and 130 Bentworth Avenue. RE: SM35278 | The Sterling Hall School | Site plan approval | 10 December 2024 | 27 June 2027 to 6 February 2030 from this topic's lead times (n=40) |
| SM24337 Matters relating to the redevelopment of 265 Balliol Street. | Balliol Limited Partnership | Site plan approval | 11 April 2017 | 27 June 2027 to 23 October 2030 from all topics' lead times (n=44) |
| SM30331 Evermore, 10 Eva Road, Etobicoke | Deltera Inc. | Site plan approval | 15 July 2020 | 28 June 2027 to 20 September 2030 from all topics' lead times (n=132) |
| SM37749 3450 Dufferin Street | Fitzrovia | Site plan approval | 2 July 2026 | 29 June 2027 to 23 February 2030 from this topic's lead times (n=68) |
| SM37208 229-241, 243, 245, 251, 255 & 260 Consumers Road and 14 William Sylvester Drive | Parkway View Property LP | Site plan approval | 3 December 2025 | 1 July 2027 to 2 December 2029 from this topic's lead times (n=54) |
| SM37864 2400-2440 Dundas St W, Toronto, ON M6P 1W9, Canada | Fora Developments | Site plan approval | 17 August 2026 | 6 July 2027 to 17 March 2030 from this topic's lead times (n=71) |
| SM37866 2654-2636 Eglinton Ave W, Toronto, ON M6M 1T7 | Fora Developments | Site plan approval | 17 August 2026 | 6 July 2027 to 17 March 2030 from this topic's lead times (n=71) |
| SM37868 2424 Finch Ave W North York, ON M9M 2E2, Canada | Fora Developments | Site plan approval | 17 August 2026 | 6 July 2027 to 17 March 2030 from this topic's lead times (n=71) |
| SM37869 1840 Eglinton Ave W, Toronto, ON M6E 5B2 | Fora Developments | Site plan approval | 17 August 2026 | 6 July 2027 to 17 March 2030 from this topic's lead times (n=71) |
| SM34807 Planning and Development Applications for 1 and 6-16 Sumach Street, Toronto | Block Developments Inc. | Site plan approval | 14 September 2023 | 8 July 2027 to 29 March 2030 from this topic's lead times (n=22) |
| SM32762 77 Union St Development site. KSC Local Area Study and St Clair TMP underway. Mix-land uses would be allowed in accordance with KSC LAS preliminary draft Recommendations. PAC meeting to be determined. Combined Applicatio | Primaris REIT | Site plan approval | 5 January 2022 | 8 July 2027 to 22 June 2029 from this topic's lead times (n=12) |
| SM19890 Site Plan approval for St. Michael's Hospital including air ambulance issues | St. Michael's Hospital | Site plan approval | 28 November 2013 | 8 July 2027 to 5 January 2029 from all topics' lead times (n=14) |
| SM34043 Planning application for the redevelopment of 2451 Danforth Avenue. | First capital Realty | Site plan approval | 16 January 2023 | 9 July 2027 to 7 November 2029 from this topic's lead times (n=17) |
| SM34046 Development and construction coordination matters related to purpose-built rental apartment at 260 King Street East. | Fitzrovia Residential Inc. | Site plan approval | 16 January 2023 | 9 July 2027 to 7 November 2029 from this topic's lead times (n=17) |
| SM32779 250 Bowie Avenue | Hullmark Developments Limited | Site plan approval | 6 January 2022 | 9 July 2027 to 23 June 2029 from this topic's lead times (n=12) |
| SM36058 177 Caledonia Road/31 Innes Avenue Planning applications | Frontdoor Developments (4700 Bathurst) Inc. | Site plan approval | 22 October 2024 | 10 July 2027 to 12 March 2030 from this topic's lead times (n=38) |
| SM36061 Proposed residential building at 1650 Sheppard Avenue East | 2076204 Ontario Limited | Site plan approval | 23 October 2024 | 11 July 2027 to 13 March 2030 from this topic's lead times (n=38) |
| SM30124 25 Ontario Street - planning and development of 24-storey, 460,000 sf LEED Gold office building. | First Gulf | Site plan approval | 1 June 2020 | 12 July 2027 to 29 August 2030 from all topics' lead times (n=127) |
| SM37881 3526 Lakeshore Blvd West | Minto (3526 Lakeshore) Inc. | Site plan approval | 24 August 2026 | 13 July 2027 to 24 March 2030 from this topic's lead times (n=71) |
| SM24268 Matters relating to planning approvals for development of mixed and mid-rise condominiums and stacked townhouse proposal at 2175 Keele Street | Diamondcorp | Site plan approval | 27 April 2017 | 13 July 2027 to 8 November 2030 from all topics' lead times (n=44) |
| SM32796 To permit a high density mixed use development at 2189 Lake Shore Boulevard West at Park Lawn. | Marlin Spring Developments | Site plan approval | 11 January 2022 | 14 July 2027 to 28 June 2029 from this topic's lead times (n=12) |
| SM32797 Development application for a 52 storey mixed use building located at 5251 Dundas Strreet West | Aukland Residences Inc | Site plan approval | 11 January 2022 | 14 July 2027 to 28 June 2029 from this topic's lead times (n=12) |
| SM27793 1050 Sheppard Avenue West | Greenwin Inc. | Site plan approval | 5 March 2019 | 15 July 2027 to 29 August 2030 from all topics' lead times (n=84) |
| SM27795 228 Wilson Avenue | Greenwin Inc. | Site plan approval | 5 March 2019 | 15 July 2027 to 29 August 2030 from all topics' lead times (n=84) |
| SM37895 3526 Lakeshore Blvd West | Minto (3526 Lakeshore) Inc. | Site plan approval | 27 August 2026 | 16 July 2027 to 27 March 2030 from this topic's lead times (n=71) |
| SM28572 Development Application 00 036201 NNY 24 OZ - Advising on development of 1145 Sheppard Ave. East (Block 1 of the development parcel) and associated issues with TTC Leslie station connections | Concord Adex | Site plan approval | 11 July 2019 | 16 July 2027 to 13 September 2030 from all topics' lead times (n=92) |
| SM34078 Mixed-use Development Application at 685 Warden Avenue, Toronto, ON. | CP REIT Ontario Properties Limited | Site plan approval | 25 January 2023 | 18 July 2027 to 16 November 2029 from this topic's lead times (n=17) |
| SM24439 286-294 Main Street- Development Applications | Tribute Communities | Site plan approval | 2 May 2017 | 18 July 2027 to 13 November 2030 from all topics' lead times (n=44) |
| SM29938 Redevelopment of 89 Church Street | Minto Communities Inc. | Site plan approval | 3 April 2020 | 19 July 2027 to 25 July 2030 from all topics' lead times (n=121) |
| SM28305 To Permit residential development at 2 and 6 Royal York Road, and 2663 - 2675 Lake Shore Boulevard West. | Royal York Shores Inc. | Site plan approval | 6 June 2019 | 19 July 2027 to 30 October 2030 from all topics' lead times (n=89) |
| SM24449 New 36-storey office and residential building at 2161 Yonge Street. | Tribute Communities | Site plan approval | 3 May 2017 | 19 July 2027 to 14 November 2030 from all topics' lead times (n=44) |
| SM34090 Matters relating to planning approavals for the northeast quadrant of Yonge Street at Gerrard Street East including the expansion of the existing at-risk youth she | Covenant House | Site plan approval | 27 January 2023 | 20 July 2027 to 18 November 2029 from this topic's lead times (n=17) |
| SM32833 Matters relating to planning and development of lands municipality known as 100 Simcoe Street | BentallGreenOak | Site plan approval | 17 January 2022 | 20 July 2027 to 4 July 2029 from this topic's lead times (n=12) |
| SM27931 474 Wellington Street West development application for a new office building. Height, massing and heritage elements of proposed combined development (474-488 Wellington Street West) and related LPAT appeal. Related econo | Hullmark Developments Limited | Site plan approval | 28 March 2019 | 20 July 2027 to 30 August 2030 from all topics' lead times (n=85) |
| SM24472 400 King Street West mixed use development | Plazacorp Investments Limited | Site plan approval | 5 May 2017 | 21 July 2027 to 16 November 2030 from all topics' lead times (n=44) |
| SM24480 Assisting with the planning and development application for 2161 Yonge Street | Tribute Communities | Site plan approval | 5 May 2017 | 21 July 2027 to 16 November 2030 from all topics' lead times (n=44) |
| SM32847 Various potential development sites. 17 Rhodes Ave. | Percy Ellis Holdings Inc | Site plan approval | 20 January 2022 | 23 July 2027 to 7 July 2029 from this topic's lead times (n=12) |
| SM27935 Assist with development applications and approvals for 88 Queen Street East. | 88 Queen Fitzrovia Inc. | Site plan approval | 1 April 2019 | 24 July 2027 to 3 September 2030 from all topics' lead times (n=85) |
| SM27946 Redevelopment of 7-21 Richgrove Drive and 620 Martin Grove Road | Minto Communities Inc. | Site plan approval | 2 April 2019 | 25 July 2027 to 4 September 2030 from all topics' lead times (n=85) |
| SM27947 Redevelopment of 740 and 750 York Mills Road and 17 Farmstead Road | Minto Communities Inc. | Site plan approval | 2 April 2019 | 25 July 2027 to 4 September 2030 from all topics' lead times (n=85) |
| SM27952 Assist with development approvals for 110 Maitland Street | Minto Communities Inc. | Site plan approval | 2 April 2019 | 25 July 2027 to 4 September 2030 from all topics' lead times (n=85) |
| SM27704 Approval, processing related to development at Sheppard Ave E and Pharmacy Ave. | 462017 Ontario Limited | Site plan approval | 15 March 2019 | 25 July 2027 to 8 September 2030 from all topics' lead times (n=84) |
| SM34047 6035 Bathurst Street - Proposed Redevelopment | Resident | Site plan approval | 2 February 2023 | 26 July 2027 to 24 November 2029 from this topic's lead times (n=17) |
| SM34048 150-160 Cactus Ave. - Proposed Redevelopment | Resident | Site plan approval | 2 February 2023 | 26 July 2027 to 24 November 2029 from this topic's lead times (n=17) |
| SM34133 Planning applications for 4700 Bathurst Street. | Frontdoor Developments (4700 Bathurst) Inc. | Site plan approval | 2 February 2023 | 26 July 2027 to 24 November 2029 from this topic's lead times (n=17) |
| SM27951 Residential and commercial real estate development and construction for 295 Jarvis Street | Minto Communities Inc. | Site plan approval | 3 April 2019 | 26 July 2027 to 5 September 2030 from all topics' lead times (n=85) |
| SM27958 Redevelopment of 12, 16, 18 and 20 Cordova Avenue | Minto Communities Inc. | Site plan approval | 3 April 2019 | 26 July 2027 to 5 September 2030 from all topics' lead times (n=85) |
| SM35015 2 & 10 Audley Street and 29,51,59 &71 Portland Stree | Minto Communities Inc. | Site plan approval | 13 November 2023 | 27 July 2027 to 5 March 2030 from this topic's lead times (n=23) |
| SM30513 Master Planning and Development of Canada Square (2180 to 2210 Yonge Street) | OPGI Management GP Inc. | Site plan approval | 28 August 2020 | 27 July 2027 to 22 October 2030 from all topics' lead times (n=136) |
| SM27963 Redevelopment of 740 and 750 York Mills Road and 17 Farmstead Road | Minto Communities Inc. | Site plan approval | 4 April 2019 | 27 July 2027 to 6 September 2030 from all topics' lead times (n=85) |
| SM27964 Redevelopment of 7-21 Richgrove Drive and 620 Martin Grove Road | Minto Communities Inc. | Site plan approval | 4 April 2019 | 27 July 2027 to 6 September 2030 from all topics' lead times (n=85) |
| SM27965 Redevelopment at 19 Glen Agar Drive, Etobicoke | Minto Communities Inc. | Site plan approval | 4 April 2019 | 27 July 2027 to 6 September 2030 from all topics' lead times (n=85) |
| SM27969 Redevelopment of 502 Adelaide Street West and 119-123 Portland Street | Minto Communities Inc. | Site plan approval | 4 April 2019 | 27 July 2027 to 6 September 2030 from all topics' lead times (n=85) |
| SM34882 567 Sheppard Avenue East, YMCA | Deltera Inc. | Site plan approval | 6 October 2023 | 30 July 2027 to 20 April 2030 from this topic's lead times (n=22) |
| SM29962 * assist owner with getting all approvals and permits in order to build approved development at 1 & 2 Meadowglen Place, 1021 and 1151 Markham Road including site plan, foundation permits, building permits, occupancy perm | Lash Group of Companies | Site plan approval | 14 April 2020 | 30 July 2027 to 5 August 2030 from all topics' lead times (n=121) |
| SM36112 170-180 Merton Street | Graywood Developments Ltd. | Site plan approval | 12 November 2024 | 31 July 2027 to 2 April 2030 from this topic's lead times (n=38) |
| SM30640 480 Yonge St. - 451 unit apartment building | QuadReal Real Property Group Limited Partnership | Site plan approval | 1 October 2020 | 31 July 2027 to 29 September 2030 from all topics' lead times (n=140) |
| SM36262 Ongoing planning and development issues for "Galleria on the Park" project (Dufferin & Dupont) | Almadev | Site plan approval | 14 January 2025 | 1 August 2027 to 13 March 2030 from this topic's lead times (n=40) |
| SM36103 The applicant wishes to discuss Council's consideration of its mixed-use proposal at 595 Front Street West (Rail Deck Development). | Fengate Capital Management Limited | Site plan approval | 13 November 2024 | 1 August 2027 to 3 April 2030 from this topic's lead times (n=38) |
| SM34150 New East Block Development 6 Dawes Road | 6 Dawes Fitzrovia LP & Ontario Holdings Ltd. | Site plan approval | 8 February 2023 | 1 August 2027 to 30 November 2029 from this topic's lead times (n=17) |
| SM30516 Development and Planning Approvals for 25 Brimley Road | OPGI Management GP Inc. | Site plan approval | 2 September 2020 | 1 August 2027 to 27 October 2030 from all topics' lead times (n=136) |
| SM29689 Lobbying for redevelopment of our property located at 60 Birmingham Street | QuadReal Real Property Group Limited Partnership | Site plan approval | 10 February 2020 | 1 August 2027 to 15 June 2030 from all topics' lead times (n=115) |
| SM34159 1900 Eglinton Avenue East | SmartCentres REIT | Site plan approval | 9 February 2023 | 2 August 2027 to 1 December 2029 from this topic's lead times (n=17) |
| SM34160 Toronto Westside Mall 2400 Eglinton Avenue West | SmartCentres REIT | Site plan approval | 9 February 2023 | 2 August 2027 to 1 December 2029 from this topic's lead times (n=17) |
| SM34165 381 Wilson Avenue | SmartCentres REIT | Site plan approval | 9 February 2023 | 2 August 2027 to 1 December 2029 from this topic's lead times (n=17) |
| SM26094 Block 1 - 1181Sheppard Avenue East, Toronto | Concord Adex | Site plan approval | 23 April 2018 | 2 August 2027 to 23 May 2030 from all topics' lead times (n=62) |
| SM36268 39 Newcastle Street | OSMINGTON GEROFSKY DEVELOPMENT CORP | Site plan approval | 17 January 2025 | 4 August 2027 to 16 March 2030 from this topic's lead times (n=40) |
| SM35042 190 Simcoe St Toronto, ON M5T 2W5 | GWL Realty Advisors Inc. | Site plan approval | 22 November 2023 | 5 August 2027 to 14 March 2030 from this topic's lead times (n=23) |
| SM35044 180 Queen St W Toronto, ON M5V 3L7 | GWL Realty Advisors Inc. | Site plan approval | 22 November 2023 | 5 August 2027 to 14 March 2030 from this topic's lead times (n=23) |
| SM35045 180 Simcoe St Toronto, ON M5T 2W5 | GWL Realty Advisors Inc. | Site plan approval | 22 November 2023 | 5 August 2027 to 14 March 2030 from this topic's lead times (n=23) |
| SM37962 335 Yonge Street, Site Plan Approval Application | Khalil Assaad | Site plan approval | 30 September 2026 | 6 August 2027 to 29 April 2030 from this topic's lead times (n=72) |
| SM30678 Proposed mixed use development at 241 Church St | Graywood Developments Ltd. | Site plan approval | 7 October 2020 | 6 August 2027 to 5 October 2030 from all topics' lead times (n=140) |
| SM34920 6080 Yonge Street at Homewood Avenue | Deltera Inc. | Site plan approval | 16 October 2023 | 9 August 2027 to 30 April 2030 from this topic's lead times (n=22) |
| SM23327 370 & 372 Briar Hill Avenue | Plazacorp Investments Limited | Site plan approval | 8 July 2016 | 9 August 2027 to 17 July 2030 from all topics' lead times (n=32) |
| SM28267 Edenbridge on the Kingsway - 255 The Kingsway Toronto | Deltera Inc. | Site plan approval | 31 May 2019 | 10 August 2027 to 26 October 2030 from all topics' lead times (n=88) |
| SM32919 Pursuing development approvals and building permits of 20 Caledonia Road and 1500 St Clair Ave | Alterra Developments 2000 Limited | Site plan approval | 9 February 2022 | 12 August 2027 to 27 July 2029 from this topic's lead times (n=12) |
| SM32920 Pursuing development approvals and building permits of 50-64 Merton Street | Alterra Developments 2000 Limited | Site plan approval | 9 February 2022 | 12 August 2027 to 27 July 2029 from this topic's lead times (n=12) |
| SM25181 Assisting with the development of 10-16 Wellesley Street West. | Fitzrovia Capital Incorporated | Site plan approval | 18 October 2017 | 12 August 2027 to 12 February 2031 from all topics' lead times (n=51) |
| SM27489 Pursuing development approvals and building permits of 51 Camden | Alterra Developments 2000 Limited | Site plan approval | 31 January 2019 | 15 August 2027 to 11 November 2030 from all topics' lead times (n=79) |
| SM27490 Pursuing development approvals and building permits of 125 George Street | Alterra Developments 2000 Limited | Site plan approval | 31 January 2019 | 15 August 2027 to 11 November 2030 from all topics' lead times (n=79) |
| SM27570 Development application at 2400-2444 Yonge Street. | First capital Realty | Site plan approval | 7 February 2019 | 16 August 2027 to 28 October 2030 from all topics' lead times (n=80) |
| SM27589 5995-5997 Yonge St - Development efforts | Sorbara Group of Companies | Site plan approval | 7 February 2019 | 16 August 2027 to 28 October 2030 from all topics' lead times (n=80) |
| SM27590 6150 Yonge St - development efforts | Sorbara Group of Companies | Site plan approval | 7 February 2019 | 16 August 2027 to 28 October 2030 from all topics' lead times (n=80) |
| SM27502 Assisting with development application for 680-688 Sheppard Avenue East | Autumn Peak Developments Inc. | Site plan approval | 1 February 2019 | 16 August 2027 to 12 November 2030 from all topics' lead times (n=79) |
| SM35104 General engagement - Application being made for 250 Bowie Avenue, Toronto | Hullmark Asset Management | Site plan approval | 5 December 2023 | 18 August 2027 to 27 March 2030 from this topic's lead times (n=23) |
| SM25321 redevelopment of 4686-4690 Dundas Street West | The Remington Group Inc. | Site plan approval | 16 November 2017 | 18 August 2027 to 14 February 2031 from all topics' lead times (n=52) |
| SM34957 To inquire with City staff regarding outstanding transportation comments related to Site Plan Control Application #23 138584 NNY 08 SA - 3302 Dufferin Street | RioCan Management Inc. | Site plan approval | 26 October 2023 | 19 August 2027 to 10 May 2030 from this topic's lead times (n=22) |
| SM26977 Matters relating to the redevelopment of 63 and 73 Widdicombe Hill Boulevard (former City of Etobicoke) | Frasmet Holdings Limited | Site plan approval | 12 November 2018 | 19 August 2027 to 4 November 2030 from all topics' lead times (n=73) |
| SM29700 630-686 Finch Avenue East future planning/development application | Deltera Inc. | Site plan approval | 30 January 2020 | 20 August 2027 to 14 June 2030 from all topics' lead times (n=113) |
| SM22125 501 Yonge Street | Lanterra Developments | Site plan approval | 13 August 2015 | 20 August 2027 to 12 March 2030 from all topics' lead times (n=23) |
First 200 shown. The full feed is available from the API at /api/v1/insights/upcoming.
How well the window has worked
Backtest on registrations whose first linked item fell between 1 December 2018 and 14 November 2022: no registration could be evaluated (0 of 0 evaluable; 0 registrations with a published first linked item in the period). Each window uses only lead times known before the registration was approved.
Method: iqr-conditional-v1: window = interquartile range of lead times known before approval (topic if n>=10, else pooled); hit when the first published linked item falls inside.
How the window is estimated
- Lead timeDays from a registration's approval to its first published linked agenda item.
- ConditionKeep past lead times longer than the days this registration has already waited.
- WindowThe middle half (25th to 75th percentile) of those lead times.
- Lead time is the number of days from a registration's initial approval date to the first agenda item it is linked to. Only published links count (model score 0.7 or higher).
- For an open registration with no linked item after d days, the window is the middle half (25th to 75th percentile) of the historical lead times longer than d, using its topic's lead times when the topic has at least 10, otherwise all topics together.
- A spike is a month whose new registrations exceed the topic's mean over the previous 12 months by more than 2 standard deviations (and at least 3 registrations). Monthly volumes use the topic from the registry's subject categories until the decision model has tagged at least 95% of registrations, so that months tagged by different methods are not compared.
- Topics come from the tracker's taxonomy, assigned by a decision model from the registration text. Until the model has run on a registration, the topic is taken from the registry's own subject category and marked as such.
A window is a statistical estimate from past registrations, not a prediction that council will consider the matter. Many registrations never lead to an agenda item.