lobbyTO

Early warning

Upcoming at council

Open lobbying registrations that are not yet linked to any council or committee agenda item, with an estimated window for when a linked item may appear, based on how long past registrations on the same topic took.

Open registrations without a linked item
1,609
1,609 registrations
With an estimated window
1,589
99% of open registrations
Windows that held in the backtest
—
No registration could be evaluated yet
Lead-time sample
1,207
Registrations with a published link

1,609 open registrations without a linked item; 1,589 have an estimated window. Lead times are drawn from 1,207 registrations with a published link.

Open registrations by topic

Top 10

Topic spikes in the last 12 months

New registrations vs previous 12-month average
Data table· 26 rows

Open registrations: Environmental assessments

All topics →
Data table· 3 rows
RegistrationClientTopicApprovedEstimated window for a linked item
SM37494
2400-2440 Dundas St. W.
Fora DevelopmentsEnvironmental assessments16 March 202613 March 2027 to 16 January 2031
from all topics' lead times (n=754)
SM28598
The Residential and Civil Construction Alliance of Ontario (RCCAO) released a report on July 17th on the Municipal Class Environmental Assessment Process in Ontario.
Residential and Civil Construction Alliance of OntEnvironmental assessments19 July 201924 July 2027 to 21 September 2030
from all topics' lead times (n=92)
SM35869
Consulting Engineering and Environmental Services
CIMA+Environmental assessments28 August 202419 October 2027 to 7 September 2031
from all topics' lead times (n=383)

How well the window has worked

—No registration could be evaluated in the backtest period.

Backtest on registrations whose first linked item fell between 1 December 2018 and 14 November 2022: no registration could be evaluated (0 of 0 evaluable; 0 registrations with a published first linked item in the period). Each window uses only lead times known before the registration was approved.

Method: iqr-conditional-v1: window = interquartile range of lead times known before approval (topic if n>=10, else pooled); hit when the first published linked item falls inside.

How the window is estimated

  1. Lead timeDays from a registration's approval to its first published linked agenda item.
  2. ConditionKeep past lead times longer than the days this registration has already waited.
  3. WindowThe middle half (25th to 75th percentile) of those lead times.

A window is a statistical estimate from past registrations, not a prediction that council will consider the matter. Many registrations never lead to an agenda item.